The improvement of the energy performance in the buildings of the Multi-Speciality Hospital in Zgorzelec

Project facts

Project promoter:
Multi-Speciality Hospital - Independent Public Health Care in Zgorzelec
Project Number:
PL04-0035
Target groups
Disabled,
Elderly people
Status:
Completed
Initial project cost:
€1,723,381
Final project cost:
€1,677,827
From EEA Grants:
€ 1,327,970
The project is carried out in:
Dolnośląskie

Description

The Multi Speciality Hospital in Zgorzelec is a public institution which provides medical services to about 94,000 inhabitants of the Zgorzelec county as well as to the inhabitants from surrounding counties. The Multi Speciality Hospital in Zgorzelec treats more than 30,000 inpatients and almost 200,000 outpatients every year. The objective of the project is a reduction in total energy demand in the building of the Multi Speciality Hospital in Zgorzelec and reduction in carbon dioxide emissions. The project is expected to reduce carbon dioxide emissions by 56%, cause reduction in total energy demand by 30.09% and reduction in the maintenance costs of heating, hot water and electric power systems in the building. The project provides: building insulation, replacement of the heating system, construction and launch of a natural gas cogeneration system, replacement of the hot water system, installation of solar panels. The local community and the environment will benefit because of improved air quality, as well as obtaining reduced carbon dioxide emissions The Multi Speciality Hospital in Zgorzelec will also reduce its energy expenses. Projects material scope has been extended, additional works have been co-financed under EEA

Summary of project results

The Multi Speciality Hospital in Zgorzelec is a public institution which provides medical services to about 94,000 inhabitants of the Zgorzelec county as well as to the inhabitants from surrounding counties. The Multi Speciality Hospital in Zgorzelec treats more than 30,000 inpatients and almost 200,000 outpatients every year. The objective of the project was a reduction in total energy demand in the building and reduction in carbon dioxide emissions. Thermomodernisational works covered one building, thanks to them after projects ending costs connected with buildings usage will be lower. Within the project over 2,2 thousands of m2 of partition were insulated, old windows were replaced. Modernised were interior installations and district heating. Installed were high-efficiency cogeneration devices, solar collectors (156) and automation system. Interior lighting was exchanged for ecological one. Investment allowed to reduce CO2 emission (3051 Mg/year). The local community and the environment benefit from the project because of improved air quality, as well as obtaining reduced carbon dioxide emissions The Multi Speciality Hospital in Zgorzelec also reduced its energy expenses. Projects material scope has been extended, additional works have been co-financed within EEA fund