Thermomodernization of two public buildings in Poreba

Project facts

Project promoter:
community Poręba
Project Number:
PL04-0078
Target groups
Civil servants/Public administration staff,
Schools and other institutions providing education and/or training at all levels
Status:
Completed
Initial project cost:
€106,318
Final project cost:
€106,318
From EEA Grants:
€ 84,149
The project is carried out in:
Śląskie

Description

The project will reduce the emission of greenhouse gases and increase the share of renewable energy in the energy consumption balance of two public buildings in Poręba. The buildings are old facilities, built in a traditional (brick) technology, which does not meet the contemporary norms aiming at energy saving and reduction of greenhouse gases. The objective of the project is the reduction of greenhouse gases emission and air pollution, as well as the increase of the share of renewable energy in the general energy consumption balance of two public buildings, achieved through thermomodernisation. The expected result is a reduction of CO2 emission at a level of 337,41 Mg/year, and the production of energy from the renewable sources at a level of 3,86 MW h/year. The entity which is implementing the project is the City Hall of Poręba, and the main beneficiaries of the project, in addition to its environmental benefits, are the residents of Poręba.

Summary of project results

The buildings are old facilities, built in a traditional (brick) technology, which didn't meet the contemporary norms aiming at energy saving and reduction of greenhouse gases. The objective of the project was the reduction of greenhouse gases emission and air pollution, as well as the increase of the share of renewable energy in the general energy consumption balance of two public buildings, achieved through thermomodernisation. Within the project over 4,5 thousands of m2 of partition were insulated, 100 windows frames and doors were replaced. Also central heating installation and ventilation were modernized, 2 ecological boilers and solar collectors installed. Investment allowed to reduce CO2 emission (320 Mg/year). Project was ended after final date of eligibility from Beneficiaries own funds. The main beneficiaries of the project, in addition to its environmental benefits, are the residents of Poręba.

Summary of bilateral results