Improvement of energy efficiency in buildings

Project facts

Project promoter:
community Tuchów
Project Number:
PL04-0046
Target groups
Children ,
Schools and other institutions providing education and/or training at all levels
Status:
Completed
Initial project cost:
€221,684
Final project cost:
€212,893
From EEA Grants:
€ 168,501
The project is carried out in:
Małopolskie

Description

The poor conditions of installation and thermal insulation, inefficient lightening, old boilers, inefficient heating systems, and old windows and doors cause significant losses of energy. The objective of this project is to reduce the emission of greenhouse gases and air pollutants. The project will contribute to reaching this objective through thermal insulation work (1860,05 m2 walls), the replacement of 187 windows and 6 doors, the replacement of three inefficient boilers, heating upgrades, and the replacement of indoor lightening. Thanks to the project, the energy efficiency in three public buildings in Tuchow will be improved, resulting in an annual savings of 268,52 tons of CO2 emissions being obtained. The main beneficiaries of the projects are the people who spend their days in those buildings, especially the staff and the children. The project will contribute to a better environment, and thanks to the reduction in CO2 emission, the entire community will breath cleaner air and be less likely to experience health problems in the future. Projects material scope has been extended, additional works have been co-financed under NFM

Summary of project results

Tuchów Municipality has been struggled with significant losses of energy in public utility buildings. Beneficiary decided to conduct investement which was possible thanks to EEA and NFM grants. Thermomodernisational works covered 3 public utility buildings (communal building, city hall, educational building). Within the project over 2 thousands of m2 of partition were insulated, almost 200 windows and doors were replaced. Modernised were interior installation, 3 boilers were replaced for ecological ones. The main beneficiaries of the projects are the people who spend their days in buildings, especially the staff and the children. Investment allowed to reduce CO2 emission (304 Mg/year). Projects material scope has been extended, additional works have been co-financed under NFM.

Summary of bilateral results