PDP #4: Safety Enhancement of Ignalina NPP Radioactive Waste management

Project facts

Project promoter:
Ignalina Nuclear Power Plant (INPP)(LT)
Project Number:
LT-ENVIRONMENT-0004
Status:
In implementation
Initial project cost:
€3,027,291
Donor Project Partners:
Norwegian Radiation and Nuclear Safety Authority (DSA)(NO)
Other Project Partners
State Nuclear Power Safety Inspectorate (VATESI)(LT)

Description

The project will provide an exceptional opportunity to work together to improve expertise in nuclear decommissioning and competencies to reduce risk of negative impact on people and the environment and gain, together with VATESI and the DSA, the best world practices in a safe and efficient decommissioning.

The objective of the project is to improve management, control and prevention of negative impact of radioactive materials stored at Ignalina Nuclear Power Plant (INPP) on the environment and the population. This project will contribute to the safe management of radioactive waste.

Specifically, the project will allow Lithuania to start the initial stages of a Deep Geological project, which is necessary for the long-term storage of radioactive waste and required safety assessments for storage of industrial waste from INPP and assessments for a third waste stream - bituminized waste.

The project will also conduct training and capacity building exercises, including experience sharing between Lithuania and Norway through the partnership with DSA and VATESI.

The project includes:

  • Social and economic evaluation and criteria for selection of potential region for Deep Geological Repository
  • Geophysical (seismic) survey programme
  • Geophysical (seismic) investigations
  • Site descriptive model for deep borehole
  • Development of concept for spent nuclear fuel (SNF) and radioactive waste (RW) final disposal in clay
  • Establishment of conditional radiological clearance levels for industrial waste storage site
  • Review and evaluation of bituminized waste storage facility transformation into a repository concept and safety analysis report review
  • Final review report on bituminized waste storage facility transformation into a repository site
  • Training of professional employees
  • Technical meetings for professional employees
    Target groups of the project: INPP, VATESI, DSA, society.