Design and implementation of a network for air quality measurement in the city of Tišnov

Project facts

Project promoter:
Transport research centre(CZ)
Project Number:
CZ-ENVIRONMENT-0151
Status:
In implementation
Initial project cost:
€84,404
Other Project Partners
Tišnov(CZ)

More information

Description

The project plan builds on the project from Call 2A "Tromso" from the program "Environment, Ecosystems and Climate Change" financed from Norway Grants (project Detailed monitoring of polycyclic aromatic hydrocarbons in connection with the refinement of the Air Quality Improvement Plan of the Southeast Zone CZ06Z 2020+ (PAUPZKO)). Three 14-day measurements (winter 2022, summer 2022, winter 2023) were carried out at one location in the town of Tišnov (locality at the Smíškova Primary School). The measurement will be carried out using sensor units that allow measuring the concentration of aerosol particles PM10, PM2.5 and PM1, as well as meteorological parameters. Metrological traceability will be ensured in the form of comparative measurement of sensors with reference or equivalent devices (equipment regularly metrologically traced to certified reference materials or calibrated by calibration laboratories) in real outdoor conditions based on colocation. The measurement will take place for 40 days at one of the selected locations within the measuring points in the territory of the town of Tišnov. After the completion of the measurement, the units will be deployed to individual locations that were selected in cooperation with the Tišnov town leadership. The measurement itself will be carried out for a period of 8 months).

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.