Increase the energy efficiency of buildings POLSKA GRUPA MEDYCZNA Sp. z o.o. Hospital in Blachownia 16 Sosnowa Str. by partial thermal efficiency improvement and using renewable energy sources

Project facts

Project promoter:
Poland Medical Group Limited Liability Company
Project Number:
PL04-0141
Target groups
Disabled,
Elderly people
Status:
Terminated
Initial project cost:
€827,368
Final project cost:
€0
From EEA Grants:
€ 0
The project is carried out in:
Śląskie

More information

Description

The hospital consumes 7009248.5 kWh / year and emits 2,185.49 Mg CO2 / year. Implementation of the project is necessary in order to reduce energy consumption and reduce CO2 emissions. The goal of this project is reduce greenhouse gas emissions and air pollution and increasing the share of energy from from renewable sources in the overall energy consumption balance. Goal will be achieved through the construction of thermo-building at the levels currently generating the biggest energy losses: the basement, roof and flat roof and the installation of lighting, PV Through the implementation of project tasks will be possible to reduce energy consumption by 6.08% (426,109 kWh / year) and reduce emissions CO2 by 36% (by 790.3 MgCO2 / year). Assumptions of the project will be achieved through: 784,50 m2 insulated walls, 2255,30 m2 insulated flat roof, 389.80 m2 insulated the roof, 27,03 m2 said windows (24 pieces), 12,83 m2 said door (5 pieces), Installation of two gas burners, 1295 pcs advanced LED luminaires, 462 pcs. of photovoltaic panels (PV). The technology used, quality of materials and periodic maintenance processes, guarantee that the modernized infrastructure will be used continuously for a minimum of 5 years from the completion of the project. This makes it possible will be to implement the set goals and achieving expected results. The following entities will benefit from the project: Polska Grupa Medyczna Sp. z o.o. beneficiary - the owner of the object. The direct users of the object, they are hospital patients and staff modernized facility. The inhabitants of the province Silesia in Poland. The natural environment.

Summary of project results

Beneficiary has resigned from project implementation (letter 29.06.2015)