Retrofitting of public buildings in the Municipality Bodzanów

Project facts

Project promoter:
community Bodzanów
Project Number:
PL04-0130
Target groups
Civil servants/Public administration staff,
Students
Status:
Completed
Initial project cost:
€149,955
Final project cost:
€149,713
From EEA Grants:
€ 118,495
The project is carried out in:
Mazowieckie

Description

The School Complex is located in Nowe Miszewo, Commune Bodzanów, county Plock, Mazovian voivodeship included in the Vistula River Protected Landscape Area. The main problem is connected with considerable energy loose (slippage) in the building due to the fact that building does not fulfil requirements in the thermal insulation, there is lack of applying renewable energy sources. The object is warmed by oil central heating. Many technological defects cause the walls freezing, the weak insulating of barriers causes the moisture and the mouldiness, what has also negative impact on the building’s users health. The main aim of the project is the energetic efficiency improvement of the public building and the reduction of polluting gasses emission and air pollution. The project is expected to achieve the improvement of the energy efficiency, apart the reducing the energy loose/slippage, reducing the carbon dioxide emission and it will affect quality of air, the working and health conditions for people usually exploited the building. Higher aesthetics of the building will certainly contributed to the village's attractiveness. For building the following standard improvements are suggested which may contribute to reducing the demand for the final energy: building insulation by Styrofoam and rock wool: walls, ceiling, flat roof. There is planned installation the biomass central heating. Those actions will make it possible to achieve the following results: increasing the number of thermo-insulation public buildings in the commune Bodzanow, increased renewable energy production and ecological effect – reducing polluting gasses emission. The building users, students and school’s staff are main beneficiary of this project through the betterment working and health conditions.

Summary of project results

The main problem of the School Complex in Bodzanów was connected with considerable energy loose in the building due to the fact that building didn't fulfil requirements in the thermal insulation, and didn't have any renewable energy sources. The object was warmed by oil central heating. Many technological defects caused the walls freezing, the weak insulating of barriers caused the moisture and the mouldiness, what also have had negative impact on the building’s users health. The main aim of the project was the energetic efficiency improvement of the public utility building and the reduction of polluting gasses emission and air pollution. The project was expected to achieve the improvement of the energy efficiency, apart the reducing the energy loose/slippage, reducing the carbon dioxide emission and affect quality of air, the working and health conditions for people usually using the building. Higher aesthetics of the building will certainly contributed to the village's attractiveness. Within the project over 3,4 thousands of m2 of partition were insulated and 2 biomass boilers with a total power in amount 255 kW were installed. Investment allowed to reduce CO2 emission (250 Mg/year) and to increase energy production from RES (582 MWh/year). The building users, students and school’s staff are main beneficiaries of this project.

Summary of bilateral results