The buildings included in the project were built in 1964 using traditional technology. The main problem is low energy efficiency, large heat losses and CO2 emissions (586.66 Mg/year). In the cold store building, the heat source is electric heaters, inserted into the rooms before the start of classes. Window and door joinery and lighting are in poor technical condition. The project is consistent with energy efficiency policies at local, nationaland European level.
As part of the project, thermo-modernization measures are planned for 3 school buildings. The main activities are: -Insulation, replacement of window and door joinery, -Modernization of ventilation, central heating installations -Replacement of lighting with LEDs -Installation of a PV system (3 systems, total power of 49 kWe) and a heat pump (53 kWe) -Installation of Energy Management System (3 systems) Educational and promotional activities are also an important component of the project.
Savings: Final energy :68.17%; CO2: 77.29%; Primary energy:78.49%
Production of energy from renewables 85.92 MWh/year
Grant/energy reduction: 645,24 PLN/GJ
Grant/CO2 reduction: 5 260,70 PLN/Mg
The target group includes:
- 295 school pupils;
- 60 school staff;
- 900 inhabitants of Małdyty Commune, 1000 inhabitants of Ostróda County;