Complex thermal modernization of the buildings of the Primary School in Bukwald and the Primary School in Sprecow

Project facts

Project promoter:
Gmina Dywity(PL)
Project Number:
PL-CLIMATE-0112
Status:
In implementation
Initial project cost:
€1,148,480

Description

Energy audits that have been carried out has revealed the very low energy efficiency of the school buildings in Bukwald and in Sprecowo. The low energy efficiency generates significant amounts of CO2 as well as high operating costs. SP Bukwald lacks thermal modernization and has outdated energy sources and heating systems. SP Sprecowo has a heat pump, which generates a high demand for electricity, and an outdated lights system. These problems will be solved through this project implementation.  

In the school building in Bukwald we plan to implement:

-  A complex thermal modernization of the whole building, including: insulation of building partitions, a new heat pump, central heating and hot water installation, new interior lights with energy saving LED technology to lower the usage of electricity, and a new solar system installed on the building.

In school building in Sprecowo we plan to implement: 

- New interior lights with energy saving LED technology and a new solar system installed on the building.

The project activities will allow us to reach high energetical efficiency of school buildings in Bukwald and Sprecowo. It will subsequently reduce CO2-emissions created by those buildings by at least 91% (combined).

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.