""Use of geothermal energy for heating and cooling of the municipal school of High School "" St. St. Cyril and Methodius "", Strelcha""

Project facts

Project promoter:
Municipality of Strelcha(BG)
Project Number:
BG-ENERGY-0028
Status:
In implementation
Initial project cost:
€354,320

More information

Description

The project envisages a change in the energy source for heat supply of the municipal High School “St. St. Cyril and Methodius" located in the town of Strelcha. The school consists of three buildings that have been renovated and for which an energy efficiency project has been prepared. The heating installation of the school is water-pumped with forced circulation, and three branches of the heating installation of the school are supplied by means of collectors. The project will work on the construction of a new water supply pipeline, which will supply heat to the consumer installations of the buildings. The necessary energy for the heating and cooling of the building will be obtained from two independent mineral water springs: the first is named "Sondazh 1-HG" and is located in front of the municipal Mineral Bath Strelcha, and the second is located behind the Khan Asparuh monument.

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.