Investing in a greener and healthier future

Project facts

Project promoter:
SC COMETEX SRL(RO)
Project Number:
RO-ENERGY-0080
Status:
Completed
Initial project cost:
€590,000
Final project cost:
€1,180,000

More information

Description

The main objective of the project consists in implementation of 6 integrated photovoltaic systems in order to assure electricity from renewable resources, to reduce the energy costs, the CO2 emissions and increase security of energy supply. SC Cometex aims to reduce its dependence of conventional energy as well as to optimize its expenses connected with the needed energy by procuring and installing 6 integrated photovoltaic systems with a capacity of 998,40 KW. 

The technical solutions propose the developing of photovoltaic systems for six locations: Slatina, Braila, Turda, Ploiesti, Galati and Brasov. The photovoltaic systems will be connected to the electricity grid, without active energy injection into the distribution operator''s grid, only for own consumption purposes. Each photovoltaic system is connected to the grid by the inverters, that is accompanied by a meter that measures the produced energy versus the energy that is taken-in from the grid. The photovoltaic panels will be placed on the roof of company''s facilities, using fixing structures. Key activities include:

  • Delivery and set-up of the PV systems.
  • Internal project management.
  • Publicity to ensure the visibility of the project.

Expected outcomes include an estimated annual CO2 emission reduction of 507 tonnes. The energy produced from other renewable sources in MWh/year is estimated to be around 1.110 MWh/year. The current project is representing an important step for the long term development strategy. Its implementation reduces energy consumption from conventional sources, energy cost economy and gives a partial energy autonomy.

Summary of project results

The project consists in implementation photovoltaic systems in order to reduce the energy costs, CO2 emissions and increase security of energy supply. Estimated annual reduction of 507,000 tonees.

The project implemented six integrated photovoltaic systems with a capacity of 998,40 KW in the locations of Slatina, Braila, Turda, Ploiesti, Galati, Brasov. The photovoltaic panels will be placed on the roof of company''s facilities, using fixing structures. Activities:

Activity 1. External consultancy services

Activity 2. Delivery and set-up of the photovoltaic systems

Activity 3. Internal project management

Activity 4. Project publicity

Installed photovoltaic power production of 998,40 kWp effect with an estimated 507,000 tonnes of CO2 annual reduction. Green local power backup and reduced dependency of the grid

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.