Reducing the company''s impact and sustain a green approach in the industry

Project facts

Project promoter:
Nicprem Impex SRL(RO)
Project Number:
RO-ENERGY-0071
Status:
Completed
Final project cost:
€609,390

More information

Description

The main objective of the project is to reduce Nicprem Impex energy costs and green its production processes by installing a photovoltaic integrated system with an installed capacity of 999 kWp which incorporates a clean energy power production of maximum 1260 MWh per year, to be used for own consumption. The energy production will ensure approximately 28% of the company''s energy needs. The selected technical solution and its innovativeness will support the company to achieve an estimated 386 tonnes of CO2 annual reduction.
With the implementation of this project, the applicant aims to reduce the dependency of the grid and provide green local power backup for its critical installations. The photovoltaic panels will be built on the sloping roof of the company''s production hall, located in Titu, Dambovita County, with fixing in the roofing sheet and mounting parallel to the roof covering. The photovoltaic power plant will be connected to the grid by the invertors, which is accompanied by a meter that measures the produced energy versus the energy that is taken-in from the grid. 
Key activities of the project include:

  • Investments related to the new system.
  • Publicity to ensure the visibility of the project.
  • Financial audit by an external auditor.

The project implementation will contribute to the long-term operations and development of the company by reducing the energy costs and creating energy independence, where the company will have a reliable energy supply. 

Summary of project results

The main objective of the project was to reduce Nicprem Impex energy costs and green its production processes. 

Following the implementation of the project, photovoltaic integrated system was put in place with an installed capacity of 999 kWp which incorporates a clean energy power production of maximum 1260 MWh per year, to be used for own consumption. The energy production will ensure approximately 28% of the company''s energy needs. The selected technical solution and its innovativeness will support the company to achieve an estimated 386 tonnes of CO2 annual reduction.

The project implementation has contributed to the long-term operations and development of the company by reducing the energy costs and creating energy independence.