Innovative photovoltaic system for optimizing production processes and reducing greenhouse emissions

Project facts

Project promoter:
SC Proinvest Group SRL(RO)
Project Number:
RO-ENERGY-0069
Status:
Completed
Initial project cost:
€325,425
Final project cost:
€650,834

More information

Description

The main objective of the project is to reduce Proinvest energy costs and green its production processes by installing a photovoltaic integrated system with an installed capacity of 946.40kWp which incorporates a clean energy power production of maximum 1.025 MWh per year. The selected technical solution and its innovativeness will support the company to achieve an estimated 258 tonnes of CO2 annual reduction. Along with the environmental impact, the secondary purpose of the project is to reduce the dependency of the grid and provide green local power backup for the company''s critical installations. 

In order to keep up with the increasing market need for its products, the company must increase the production accordingly. Every added unit generates an extra cost, cost that is mostly consisting of electricity, given the preponderant electricity-based machineries. By implementing a solar panel system, the company will increase its productivity through cost reduction, while it will integrate itself in more environmentally friendly parameters. Key activities include:

  • Investments related to the new system.
  • Technical design, construction and installation.
  • Project management.
  • Financial audit.
  • Publicity to ensure the visibility of the project.

Summary of project results

Through this project, Proinvest aimed to reduce its energy costs and green its production processes. 

The project''s main objective was the installation of a photovoltaic integrated system with an installed capacity of 946.40kWp which incorporates a clean energy power production of maximum 1.025 MWh per year.

 

The selected technical solution and its innovativeness will support the company to achieve an estimated 258 tonnes of CO2 annual reduction. Along with the environmental impact, the secondary purpose of the project is to reduce the dependency of the grid and provide green local power backup for the company''s critical installations. 

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.