S-GENERATION

Project facts

Project promoter:
Administratia Romana a Serviciilor de Trafic Aerian ROMATSA RA(RO)
Project Number:
RO-ENERGY-0019
Status:
Completed
Initial project cost:
€346,500
Final project cost:
€769,991

Description

This business plan was elaborated for commissioning a photovoltaic (PV) system for ROMATSA''s own use, in order to annually produce 490,7 MWh from renewable energy. The aim of the project is to produce green energy using photovoltaic panels and to integrate the system as a part of the energy network. Another target is the annual reduction of CO2 emissions by 150,15 tonnes CO2 eq./year as part of ROMATSA''s role in providing green services to their clients. 

Key activities of the project include:

  • Investments.
  • Management.
  • External financial audit.
  • Publicity to ensure the visibility of the project.

Summary of project results

Within the project a photovoltaic (PV) system was installed and is producing green electricity for ROMATSA''s own use. The installed capacity of the PV system is of 458 kWp, expected to produce annually 490,7 MWh, contributing to CO2 emissions reduction and to the greening of ROMATSA''s services. The PV system is placed on the parking lots of the Promoter, using steel structures, car parking under it, covering own consumption of approx. 8-10% of the total energy used on site.

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.