Construction of a stillage methanation plant distillery together with a cogeneration unit with a capacity of up to 3.6 MWe at the distillery plant in Zbiersk

Project facts

Project promoter:
Grupa AWW Sp. z o. o., Sp.k.(PL)
Project Number:
PL-CLIMATE-0068
Status:
Completed
Final project cost:
€7,204,699

Description

Project goals

- improvement of energy efficiency in industry

- increasing the production of energy from RES

- reduction of primary energy consumption

- reducing the emission of harmful substances to the atmosphere, including CO2,

- rational management of resources.

These challenges will be addressed through the construction of an installation for methanation of stillage, together with a cogeneration unit with a capacity of 3.493 MWe, which will be used to generate ecological electricity and heat in a highly-efficient cogeneration system.

Project plan to achieve:

-reduction of CO2 emissions by 45 747.92  t / year

-increasing energy production from RES - 58 039.8 MWh / year

- construction of a new distributed, highly efficient source of energy from RES

Who is expected to benefit from this project and how will they benefit?

Direct recipient – Grupa AWW

Indirect recipients - the whole country, because the project will allow for:

-reducing emissions

-improvement of air quality

- fulfillment of obligations towards the EU

Summary of project results

Through the construction of an installation for methanation of stillage, together with a cogeneration unit with a capacity of 3.493 MWe, which will be used to generate ecological electricity and heat in a highly-efficient cogeneration system.

Improvement of energy efficiency in industry - increasing the production of energy from RES - reduction of primary energy consumption - reducing the emission of harmful substances to the atmosphere, including CO2, - rational management of resources.

Estimated annual CO2-emissions reductions 37 563,97 tonnes/year

Estimated energy production from renewable sources (7 024,20 MWh/year

Estimated primary energy savings 31 855,91MWh/year

The prove of the achievement of the general objective indicators will be provided by the Beneficiary one year after the approval of the final Project report along with the first report on the implementation of the obligations arising from the Project agreement.

 

 

Number of industrial processes where energy efficiency (co-generation) measures have been implemented - 1

Number of awareness raising campaigns - 1