Replacement of a WR-25 coal-fired boiler with a wood-chip-fired biomass boiler with a fuel store and accompanying infrastructure in the PEC Ełk heat plant

Project facts

Project promoter:
Przedsiębiorstwo Energetyki Cieplnej w Ełku Sp. z o.o.(PL)
Project Number:
PL-CLIMATE-0047
Status:
In implementation
Initial project cost:
€7,430,595

Description

The project in question involves the construction of a 12.5 MW biomass boiler and will contribute to the increase production of system heat from renewable energy sources, thus in line with the environmental goals set out in Polish and European strategic documents. The implementation of the project will allow for:

• reducing the emission of pollutants into the air, such as: CO2, NOx, SO2, CO and dust,

• production of heat energy from renewable energy sources and its supply to the municipal network,

• replacing the production of thermal energy from coal with heat from biomass, • improvement of local energy security,

• avoiding investments in coal heat sources,

• lowering the fees for CO2 emissions,

• achieving the status of an effective heating system.

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.