More information
Description
The aim of our project is to install the pilot unit of the tertiary degree of wastewater treatment in WWTP Moravský Beroun. The realization of the project is located on the territory of the protective waterband in which springs of mineral water, which are collected for commercial purposes. For this reason, it is necessary to limit the entry of foreign substances and their metabolites into surface and subsequently into groundwater. As part of the project, we will install a new three-stage system that will allow us to reduce water pollution with drug residues. If this system proves successful in practice, it will be implemented for the entire capacity of the treatment plant.