Increasing the efficiency of the industrial processes in the production of ""Etropolski buk"" EOOD through improved energy efficiency

Project facts

Project promoter:
Etropolski buk EOOD(BG)
Project Number:
BG-ENERGY-0057
Status:
In implementation
Initial project cost:
€157,893
Donor Project Partners:
Norsk Energi AS(NO)

More information

Description

"Etropolski Buk" EOOD was founded in 2015 in the town of Etropole and is mainly engaged in logging, production of timber and furniture. Over the years, it has not stopped developing its activities since 2018. also started production of wood pellets. The production site consists of two main workshops - the "Pellets" workshop and the "Furniture and Woodworking" workshop, as well as an administrative building. The energy sources of the industrial system are electrical energy and wood pellets. The aim is, through the improvement of the energy balances of the PS, as a result of the proposed energy saving measures, to determine a higher level of energy efficiency of the processes, i.e. - increasing the efficiency of the production processes through improved energy efficiency. According to the prepared and implemented energy survey of the enterprise, the following data will be obtained on the expected saving of heat and electricity from the implementation of the measures: • Energy saving - 476,295 MWh/year. • Economy of thermal energy -2776,320 MWh/year. • Total energy savings - 3252.615 MWh/year. • Energy saving percentage - 29.18% • The annual ecological effect is in the amount of 3838.1 t/year CO2.

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.