Improving energy efficiency in public buildings in the town of Shabla

Project facts

Project promoter:
Shabla Municipality(BG)
Project Number:
BG-ENERGY-0039
Status:
In implementation
Initial project cost:
€907,272
Donor Project Partners:
International Development Norway IDN(NO)

More information

Description

The project proposal includes the introduction of energy efficiency measures in two administrative buildings on the territory of Shabla Municipality - the building of Shabla Municipality and the Regional fire department. The following energy saving measures are envisaged for implementation:For the administrative building of Shabla Municipality:1. Energy saving measure B1: Thermal insulation of external walls2. Energy saving measure B2: Replacement of joinery3. Energy saving measure B3: Thermal insulation of roof structures4. Energy saving measure B4: Thermal insulation of floor structures5. Energy saving measure C1: Introduction of heat-pump cooling / heating system6. Energy saving measure C2: Replacement of lighting fixtures7. Measure for utilization of energy from renewable sources C4: Construction of a photovoltaic system for own consumptionFor the building of the RS "Fire safety and protection of the population" - Shabla1. Energy saving measure B1: Thermal insulation of external walls2. Energy saving measure B2: Replacement of joinery3. Energy saving measure B3: Thermal insulation of roof structures4. Energy saving measure B4: Thermal insulation of floor structures5. Energy saving measure C1: Introduction of heat-pump cooling / heating system6 Energy saving measure C2: Replacement of lighting fixtures7. Measure for utilization of energy from renewable sources C4: Construction of a photovoltaic system for own consumption

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.