Improving the energy efficiency of the municipal building -
9 ""Panayot Volov"" secondary school, Snumen town and ""Panayot Volov"" secondary school, Madara village

Project facts

Project promoter:
Shumen Municipality(BG)
Project Number:
BG-ENERGY-0032
Status:
In implementation
Initial project cost:
€1,141,407
Donor Project Partners:
MPEnergi AS(NO)

More information

Description

9 SECONDARY SCHOOL PANAYOT VOLOV, TOWN OF SHUMEN AND SECONDARYSCHOOL PANAYOT VOLOV, V. MADARA municipal schools of huge significancefor for the municipality of Shumen, important for educational system throughout the region. Therefore, of all the municipal buildings in the region,the municipal leadership proposes that these two schools participate with a project proposal under the above-mentioned measure under the Norwegian Financial Mechanism The goal is after the implementation of the project to use the potential for use of energy from renewable sources and optimization of all electricity consumers in order to maximize the energy efficiency of the buildings.When a condition model is prepared, it of the buildings during the heating season was found that the school buildings maintain the required indoor temperature within acceptable limits, but at the expense of high energy consumption.1.For - 9 PANAYOT VOLOV SECONDARY SCHOOL, SHUMEN:With the implementation of measures from ECM Package 2 the building will reach energy consumption class A + and there will be a larger amount of energy savings of energy. At present, the building has a specific consumption of primary energy, which meets the requirements for energy class "G". After the implementation of the measures, the building will have a specific cost of energy which will meet the requirements- and for energy class "A +".2. For Second site: PANAYOT VOLOV SECONDARY SCHOOL, MADARA VILLAGEWith the implementation of measures from ECM Package 2 the building will reach energy consumption class A + and there will be a larger amount of energy savings rib energy. At present, the building has a specific cost, which meets the requirements for energy class F . After the implementation of the measures, the building will have a specific primary energy consumption which will meet the requirements for energy class "A +".

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.