Implementation of measures for use of geothermal energy for heating or for heating and cooling in the building of Kindergarten ""Veselushko"", Pomorie

Project facts

Project promoter:
Pomorie Municipality(BG)
Project Number:
BG-ENERGY-0029
Status:
In implementation
Initial project cost:
€239,832
Donor Project Partners:
Norsk Energi AS(NO)

More information

Description

This project proposal is under the procedure "Use of geothermal energy for heating or for heating and cooling in state or municipal buildings" under the program "WEEEES" of the EEA FM 2014-2021. In the project in the building of DG "Veselushko", in the town of Pomorie at 173 Knyaz Boris I Street, measures for the use of geothermal energy will be implemented. The choice of facilities was made on the basis of detailed calculations of the thermal needs of the building and prepared energy audit.To increase the energy efficiency of the building, it is proposed to implement a renewable energy source by building a geothermal heat pump installation, using water-cooled water cooling units. to heat pump units.Additionally, the implementation of a monitoring system for energy consumption is envisaged and includes delivery and installation of an ultrasonic heat / heat meter, taking into account the heat and cold energy generated by the heat pump units, as well as control electricity meters, project management and audit. In order to exchange experience, knowledge and best practices at the management and expert level, the municipality of Pomorie will implement the project in partnership with Norsk Energy, Norway. For the successful implementation of the project the Beneficiary will conduct procedures in accordance with the requirements of the Public Procurement Act for selection of contractors of the project activities, will participate with its representatives in the project team and will control the strict implementation of the set activities. As a result of the project implementation, the expected production from geothermal energy will be 190.53 MWh, and the saved CO2 emissions - 224,825 t / y. Installed capacity of heating equipment / units and heating and cooling, incl. hot water supply (design heat capacity) - 0,1481 MWt.

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.