More information
Description
This project proposal is aimed at the reconstruction and modernization of the municipal infrastructure - systems for outdoor artificial lighting in the town of Tryavna and the town of Plachkovtsi, through the implementation of energy-saving measures (EMS) recommended in the energy efficiency survey. The recommended ESM 1 for Tryavna is delivery and installation of 1393 pcs. new luminaires, of which 2 pcs. lighting, will be equipped with photovoltaic panels, controllers and rechargeable batteries and the introduction of a management and monitoring system. The recommended ESM 1 for the town of Plachkovtsi is delivery and installation of 562 pcs. new luminaires and the introduction of a management and monitoring system. The main objective is to increase energy efficiency through technological upgrading and modernization of the outdoor artificial lighting systems and to improve the living conditions of the population. Specific objectives: 1. Reduction of energy consumption by introducing non-energy-efficient outdoor artificial lighting; 2. Reduction of energy consumption by introducing a system for control, monitoring and management; 3. Improving the living conditions of the population, strengthening bilateral relations between donor countries and beneficiary countries.