Rehabilitation and Modernization of Municipal Infrastructure — Systems for External Artificial Lighting of Triavna and Plachkovtsi, Triavna Municipality

Project facts

Project promoter:
Tryavna Municipality(BG)
Project Number:
BG-ENERGY-0015
Status:
Completed
Final project cost:
€300,251
Donor Project Partners:
MPEnergi AS(NO)

More information

Description

This project proposal is aimed at the reconstruction and modernization of the municipal infrastructure - systems for outdoor artificial lighting in the town of Tryavna and the town of Plachkovtsi, through the implementation of energy-saving measures (EMS) recommended in the energy efficiency survey. The recommended ESM 1 for Tryavna is delivery and installation of 1393 pcs. new luminaires, of which 2 pcs. lighting, will be equipped with photovoltaic panels, controllers and rechargeable batteries and the introduction of a management and monitoring system. The recommended ESM 1 for the town of Plachkovtsi is delivery and installation of 562 pcs. new luminaires and the introduction of a management and monitoring system. The main objective is to increase energy efficiency through technological upgrading and modernization of the outdoor artificial lighting systems and to improve the living conditions of the population. Specific objectives: 1. Reduction of energy consumption by introducing non-energy-efficient outdoor artificial lighting; 2. Reduction of energy consumption by introducing a system for control, monitoring and management; 3. Improving the living conditions of the population, strengthening bilateral relations between donor countries and beneficiary countries. 

Summary of project results

Old and inefficient street lighting fixtures. High electricity and maintenance costs for the municipality''s outdoor lighting system.

Delivery and installation of new lighting fixtures, including luminaires equipped with photovoltaic panels, controllers and batteries and introduction of a control and monitoring system.

Increased energy efficiency through technological renewal and modernization of outdoor artificial lighting systems. Reduction of energy consumption through the introduction of energy-efficient outdoor artificial lighting and a control, monitoring and management system. Improvement of the living conditions of the population.

Summary of bilateral results

Improved bilateral cooperation with interested stakeholders in the field of energy efficiency to present good practices and future development of the city and the municipality in this regard.

Information on the projects funded by the EEA and Norway Grants is provided by the Programme and Fund Operators in the Beneficiary States, who are responsible for the completeness and accuracy of this information.